Warning products case study resources and assessment

The following warning products will be issued to obtain evidence of warning competency assessment criteria. 


Type of Warning issued in ppsx voice over and pdfArea Airspace coveredStage of flight planningvalidity period or fixed timeresponsibilityAMF competency 3 addressed

AIRMET_12min

PDF

FIR OR Control Area up to FL100 (FL150 In Mountains)

Pre Flight and in flight

Not more than 4 Hours

MWO (Meteorological Watch Office)

 

AMF AC 2.1.8 

Assessment

SIGMET_5min

PDF


FIR OR Control Areas

Pre Flight and in flight

Not more than 4 Hours

MWO

AMF AC 3.1.1, 3.1.2, 3.1.4, 3.1.6

Assessment

 Template for AIRMET/SIGMET graphical depiction FIR OR Control Areas Pre Flight and in flight Not more than 4 Hours MWO 

AMF AC 3.1.1, 3.1.2, 3.1.4, 3.1.6

Assessment
Low Level Wind Shear Warning case study_2min

PDF

 Aerodrome and Approach/Takeoff between runway and 500M(1600FT) 

In Flight

 For as long as Wind shear is expected to last AMO  

AMF AC 3.1.3 

Assessment

Aerodrome warnings_10min

PDF

Aerodrome warnings Case study_29min

PDF

Aerodrome

Pre and In flight

From 6 to 30 Hours Inclusive

Aviation Meteorological Office (AMO)

AMF AC 3.1.5

Assessment

Last modified: Thursday, 30 November 2023, 6:33 AM